Monday – Friday 7:00 am–6:00 pm · Saturday 8:00 am–2:00 pmCall Rafal · 773-936-9244

Bathroom Remodeling in Palatine, IL

RD Group builds bathroom remodels in Palatine and the Northwest Suburbs, from powder rooms to full primary suites. Most full bathroom remodels take 3 to 5 weeks on site. Every shower we build gets a tested waterproofing system before tile goes on.

What's included

Everything from demo to final walkthrough

  • Walk-in, curbless and tiled showers
  • Tub-to-shower conversions
  • Freestanding and drop-in tubs
  • Waterproofing systems (Schluter, Laticrete)
  • Heated floors
  • Custom and furniture-style vanities
  • Frameless glass
  • Ventilation and lighting to code

How it works

Four steps from first call to finished room

  1. Consultation

    Rafal visits, measures and talks through how you want the room to work. Free, usually within a week of your call.

  2. Written quote

    An itemized scope and fixed price a few days later, with a realistic start date.

  3. Build

    Permits pulled, materials ordered, then one crew on site from demolition to finish, with the work area sealed and cleaned daily.

  4. Walkthrough

    We go through the finished room together, close out the punch list and pass final inspection.

Reviews

What homeowners say

Ratings from every platform we're listed on, each linking to the original review.

GoogleRating coming soon
YelpRating coming soon
AngiRating coming soon
HouzzRating coming soon

FAQ

Bathroom Remodeling: cost, timing and permits

How much does a bathroom remodel cost in Palatine?

Cost depends mostly on size, tile selection, and whether plumbing moves. After a free in-home visit we give you a fixed, itemized written quote so there are no surprise line items.

How long does a bathroom remodel take?

Most full bathroom remodels take 3 to 5 weeks on site. A tub-to-shower conversion can take as little as 1 to 2 weeks.

Can you convert my tub into a walk-in shower?

Yes. Tub-to-shower conversions are one of our most common projects, including low-threshold and curbless designs for aging in place.

What waterproofing do you use in showers?

We use sheet or liquid membrane systems from Schluter or Laticrete and flood-test shower pans before tile is installed.

Free in-home consultation

Tell us about your project

Rafal will call you back within one business day to set up a visit. You'll get a fixed, itemized written quote a few days after.

Or call 773-936-9244

Request a consultation

No cost, no obligation.

Call Free Quote